Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Travel

Picture of a road closed sign and a diversion sign

ROAD CLOSURES – OCTOBER 2020 – 09.10.2020

Highway Works – Resurfacing Works

A44 – Docklow to Newhampton Farm – Revised end date

Monday, 5 October 2020 to (and including) Friday, 16 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

B4347 – B4348 Junction to Chanstone Mill – Revised dates

Thursday, 8 October 2020 to (and including) Friday, 16 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

A480 – Station Road to Brinsop Turn, Credenhill – Revised end date/times

Friday, 9 October 2020 to (and including) Thursday, 15 October 2020

Road closed 09.30 hours to 15.30 hours daily (restricted hours) – No weekend working

Traffic signals will be in operation on Friday, 16 October 2020

B4347 – Pontipina SD Joint to Blackbush – Revised end date

Friday, 9 October 2020 to (and including) Friday, 16 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

A438 – Tarrington to Ledbury LodgeNew

Monday, 12 October 2020 to (and including) Tuesday, 20 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

Please refer to attached diversion route plan.

A438 – C1097 to Surface Joint, Byford – Revised dates

Friday, 16 October 2020 to (and including) Tuesday, 20 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

Traffic signals will be in operation on Wednesday, 21 October and Thursday, 22 October 2020

A4137 – Burnthouse Green to Pigeon House – Revised end date

Friday, 16 October 2020 to (and including) Friday, 23 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

A438 – Tin Hill to Red Ley – Revised dates

Wednesday, 21 October 2020 to (and including) Monday, 26 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

Traffic signals will be in operation on Tuesday, 21 October 2020

A44 – Legions Cross towards Pembridge – Revised dates

Tuesday, 13 October 2020 to (and including) Tuesday, 20 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

A44 – Stanner – NIGHT WORKS – Revised end date

Thursday, 22 October 2020 to (and including) Monday, 26 October 2020

Road closed 20.00 hours to 06.00 hours each evening – No weekend working

A44 – C1081 to Beech Tree Cottage – Revised end date

Friday, 23 October 2020 to (and including) Friday, 30 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

A417 – Ullingswick Turn to Marsh Farm – Revised dates

Wednesday, 21 October 2020 to (and including) Friday, 30 October 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

A40 – Weston under Penyard

Monday, 26 October 2020 to (and including) Friday, 6 November 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

Traffic signals will be in operation from Tuesday, 13 October 2020 until (and including) Sunday, 25 October 2020

B4348 – Vowchurch Accident Site to Cockyard Turn – Revised dates

Monday, 26 October 2020 to (and including) Tuesday, 3 November 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

A44 – Bend approaching C1031 Crossroads from Lyonshall – Revised dates

Thursday, 29 October 2020 to (and including) Thursday, 5 November 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

A417 – Hillhampton to Burley Gate

Friday, 30 October 2020 to (and including) Friday, 6 November 2020

Road closed 09.00 hours to 17.00 hours daily – No weekend working

New Roundabout Construction

A4110/B4529 Lawtons Cross, Mortimer

Roads closed from Monday, 24 August 2020 to (and including) Friday, 30 October 2020

A combination of phased road closures 24/7 and traffic signals will be in operation, as follows:

Phase 1:             B4529 closure west of junction with A4110 – Complete

                             Monday, 24 August 2020 to Friday, 18 September 2020

Phase 2:             B4529 closure east of junction with A4110

                            Tuesday, 22 September 2020 to Friday, 16 October 2020

Phase 3:             A4110 north of junction with B4529

                            Monday, 5 October 2020 to Friday, 23 October 2020

Phase 4:             A4110 south of junction with B4539

                            Monday, 5 October 2020 to Friday, 30 October 2020

Drainage Works

A40 Lea Village Drainage Scheme

Millbrook Gardens – rolling closure

Monday, 5 October 2020 until 6 November 2020

09.00 hours to 17.00 hours daily

B4222

16 November 2020 to (and including) 20 November 2020

Lea Crossroads (Old Mill Lane – single track cul-de-sac)

23 November 2020 to (and including) 26 February 2021 although we will look to re-open during the Christmas period (between

14 December 2020 and 18 January 2021)

Bridge Works

U65607 – Paunton Lane, Paunton Bridge

Monday, 26 October 2020 and Tuesday, 27 October 2020

Road closed 08.00 hours on 26 October and will not re-open until  17.00 hours on 27 October 2020

Removal of vegetation and loose debris from riverbank

Other Road Closures

B4260 – Wilton Road, Ross on Wye

Monday, 26 October 2020 to (and including) Friday, 30 October 2020

Road closed from 08.00 hours on 26 October 2020 and will not re-open until 17.00 hours on 30 October 2020

Inspection of rock face and crest above Wilton Road.  Removal of vegetation at the base of the rock face.

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until 31 December 2020

U71411 – Garway Court Lane – Revised date

Carriageway deterioration

Full road closure in place until Friday, 4 December 2020

Road ahead closed and diversion signs

ROAD CLOSURES – AUGUST 2020 @ 17.08.2020

Highway Works – Resurfacing Works

B4214 Edwyn Ralph Village

Monday, 24 August 2020 to (and including) Friday, 28 August 2020

Road closed 09.00 hours to 17.00 hours daily

Highway Works

All works will take place between 08.00 hours and 18.00 hours each day.  The surface dressing works are scheduled to take one day to complete under a road closure with subsequent days scheduled for the white lining and cat eyes’ installation (where applicable), also planned under daily road closures.

Highway Works – Surface Dressing – Combi Works

C1061 Thornbury – New dates

[Between Junction of B4214 at joint to outside Thornbury Farm entrance]

Surface Dressing – Thursday, 20 August 2020

White Lining – Date TBC

U75238 Watery Lane, Near Hay on Wye – New dates

[Between Crossroads opposite Bell View and junction at Frog Lane]

Surface Dressing – Thursday, 20 August 2020

White Lining – Thursday, 27 August 2020

U74200 Upper Maes Coed, St Margarets – New date

[Between Cadifor Farm and Iron Pear Tree]

Surface Dressing – Thursday, 20 August 2020

C1114 Park House to C1115, Near Pencombe – New date

[Between Marsh Court joint and Park House, as marked]

Surface Dressing – Friday, 21 August 2020 (No road markings)

U74209 Tremorithic Road, Bacton (Sites 1 and 2) – New dates

[Between Hilling Grange Farm at joint and Fair Oak Farm at joint]

Surface Dressing – Friday, 21 August 2020 (No road markings)

U73411 Pinnocks Place, Allensmore (Sites 1 and 2) – New dates

[Between Crossroads opposite Bell View and Crossroads]

Surface Dressing – Friday, 21 August 2020

White Lining – Thursday, 27 August 2020

C1174 C1175 to C1165, CoddingtonNew dates

[Between junction at Broad Oak Farm and junction, as marked]

Surface Dressing – Saturday, 22 August 2020

White Lining – Friday, 28 August 2020

C1064 B4214 to U65018, Collington – New dates

[Between Field Farm House at joint to junction at point]

Surface Dressing – Saturday, 22 August 2020

White Lining – Friday, 28 August 2020

U65022 The Gains Road, Linley Green – New date

[Between Stone House at junction and Farm, top of hill]

Surface Dressing – Sunday, 23 August 2020

New Roundabout Construction

A4110/B4529 Lawtons Cross, Mortimer

Roads closed from Monday, 24 August 2020 to (and including) Friday, 30 October 2020

A combination of phased road closures 24/7 and traffic signals will be in operation, as follows:

Phase 1:             B4529 closure west of junction with A4110

                             Monday, 24 August 2020 to Friday, 18 September 2020

Phase 2:             B4529 closure east of junction with A4110

                             Monday, 14 September 2020 to Friday, 16 October 2020

Phase 3:             A4110 north of junction with B4529

                             Monday, 5 October 2020 to Friday, 23 October 2020

Phase 4:             A4110 south of junction with B4539

                             Monday, 5 October 2020 to Friday, 30 October 2020

Please refer to the attached summary plan showing the extent of work.     A plan for each phase is available if required – please let me know and I will happily forward on.

Bridge Works

U75232 – Pont-y-Weston Bridge, Dorstone

Tuesday, 1 September 2020 to (and including) Tuesday, 8 September 2020

Works taking place between 08.00 hours and 16.00 hours daily – there will be access to residents

Breaking out excess concrete, and shuttering around the upstream right abutment. Repairing Downstream right training wall.

Other Road Closures

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until 31 December 2020

U71411 – Garway Court Lane

Carriageway deterioration

Full road closure in place until Friday, 11 September 2020

Road ahead closed and diversion signs

ROAD CLOSURES – AUGUST 2020 – 10.08.20

Highway Works – Resurfacing Works

B4214 Edwyn Ralph Village

Monday, 24 August 2020 to (and including) Friday, 28 August 2020

Road closed 09.00 hours to 17.00 hours daily

Highway Works – White lining and cats eyes’ installation (where applicable) following surface dressing works already carried out

All works will take place between 08.00 hours and 18.00 hours each day.  The surface dressing works are scheduled to take one day to complete under a road closure with subsequent days scheduled for the white lining and cat eyes’ installation (where applicable), also planned under daily road closures.

A466 Derestriction – C1234 Crossroads, St Weonardsdate change

[Between Village sign and Reduce Speed sign]

White Lining – Tuesday, 11 August 2020 / Cats Eyes – Tuesday, 11 August 2020

B4521 County Boundary to A466, Broad Oakdate change

[Between Junction of A466 (as marked) and County Boundary to Wales]

White Lining – Tuesday, 11 August 2020

A466 – B4521 to 40 mph, St Weonards (2 sites) – date change

[Between junction at B4521 and HRA joint in Village]

White Lining – Tuesday 11 August 2020 / Cats Eyes – Tuesday, 11 August 2020

B4348 Hardwickedate change

[Between junction at B4352 and joint at Farm entrance]

White Lining at Junction only – Wednesday, 12 August 2020

C1226 Haywood Lane, Hereford (2 Sites) – date change

White Lining – Wednesday, 12 August 2020

C1263 – A49T to 30mph, Kings Thorn (2 Sites) – date change

[Between A49 junction at joint to bus stop in Village]

White Lining – Wednesday, 12 August 2020

A4110 Abbey Court Farm towards C1107, Wigmoredate change

[Between Court Farm and Wigmore Village]

White Lining – Wednesday, 12 August 2020 / Cats Eyes – Wednesday, 12 August 2020

A456 Easton Lodge to County Boundary, Little Hereforddate change

[Between Eaton Lodge and County Boundary to Wales]

White Lining – Wednesday, 12 August 2020 / Cats Eyes – Wednesday, 12 August 2020

B4355 – Lower Flintsham to The Stagg, Titleydate change

[Between Lower Flintsham and The Stagg PH]

White Lining – Wednesday, 12 August 2020 and Thursday, 13 August 2020

Highway Works – Surface Dressing – Combi Works

C1061 Thornbury – New dates

[Between Junction of B4214 at joint to outside Thornbury Farm entrance]

Surface Dressing – Tuesday, 18 August 2020

White Lining – Date TBC

U75238 Watery Lane, Near Hay on Wye

[Between Crossroads opposite Bell View and junction at Frog Lane]

Surface Dressing – Tuesday, 18 August 2020

White Lining – Tuesday, 25 August 2020

U74200 Upper Maes Coed, St Margarets

[Between Cadifor Farm and Iron Pear Tree]

Surface Dressing – Tuesday, 18 August 2020

C1114 Park House to C1115, Near Pencombe

[Between Marsh Court joint and Park House, as marked]

Surface Dressing – Wednesday, 19 August 2020 (No road markings)

U74209 Tremorithic Road, Bacton (Sites 1 and 2)

[Between Hilling Grange Farm at joint and Fair Oak Farm at joint]

Surface Dressing – Wednesday, 19 August 2020 (No road markings)

U73411 Pinnocks Place, Allensmore (Sites 1 and 2)

[Between Crossroads opposite Bell View and Crossroads]

Surface Dressing – Wednesday, 19 August 2020

White Lining – Tuesday, 25 August 2020

C1174 C1175 to C1165, Coddington

[Between junction at Broad Oak Farm and junction, as marked]

Surface Dressing – Thursday, 20 August 2020

White Lining – Wednesday, 26 August 2020

C1064 B4214 to U65018, Collington

[Between Field Farm House at joint to junction at point]

Surface Dressing – Thursday, 20 August 2020

White Lining – Wednesday, 26 August 2020

U65022 The Gains Road, Linley Green

[Between Stone House at junction and Farm, top of hill]

Surface Dressing – Friday, 21 August 2020

New Roundabout Construction

A4110/B4529 Lawtons Cross, Mortimer

Roads closed from Monday, 24 August 2020 to (and including) Friday, 30 October 2020

A combination of phased road closures 24/7 and traffic signals will be in operation, as follows:

Phase 1:             B4529 closure west of junction with A4110

                             Monday, 24 August 2020 to Friday, 18 September 2020

Phase 2:             B4529 closure east of junction with A4110

                             Monday, 14 September 2020 to Friday, 16 October 2020

Phase 3:             A4110 north of junction with B4529

                             Monday, 5 October 2020 to Friday, 23 October 2020

Phase 4:             A4110 south of junction with B4539

                             Monday, 5 October 2020 to Friday, 30 October 2020

Please refer to the attached summary plan showing the extent of work.     A plan for each phase is available if required – please let me know and I will happily forward on.

Bridge Works

U75232 – Pont-y-Weston Bridge, Dorstone – New dates

Tuesday, 1 September 2020 to (and including) Tuesday, 8 September 2020

Works taking place between 08.00 hours and 16.00 hours daily – there will be access to residents

Breaking out excess concrete, and shuttering around the upstream right abutment. Repairing Downstream right training wall.

Other Road Closures

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until 31 December 2020

U71411 – Garway Court Lane – New date

Carriageway deterioration

Full road closure in place until Friday, 11 September 2020

Road ahead closed and diversion signs

ROAD CLOSURES – JULY/AUGUST 2020 – 27.07.2020

Highway Works – Resurfacing Works

A4103 Roman Road, Hereford

Thursday, 23 July 2020 to (and including) Friday, 31 July 2020

Road closed 09.30 hours to 15.30 hours daily.  No weekend working

Please refer to diversion plan for these works

A417 Bend near Entrance to Whitwick Manor, Lower Eggleton

Thursday, 30 July 2020 to (and including) Tuesday, 4 August 2020

Road closed 09.00 hours to 17.00 hours daily (no weekend working)

A438 Hollybush

Monday, 3 August 2020 to (and including) Friday, 7 August 2020

Road closed 09.00 hours to 17.00 hours daily

B4214 Edwyn Ralph Village

Monday, 24 August 2020 to (and including) Friday, 28 August 2020

Road closed 09.00 hours to 17.00 hours daily

Highway Works – Surface Dressing Works (including white lining and cats eyes, if appropriate) – Revised Dates

All works will take place between 08.00 hours and 18.00 hours each day.  The surface dressing works are scheduled to take one day to complete under a road closure with subsequent days scheduled for the white lining and cat eyes’ installation (where applicable), also planned under daily road closures.

A466 Derestriction – C1234 Crossroads, St WeonardsNew dates

[Between Village sign and Reduce Speed sign]

Surface Dressing – Monday, 3 August 2020

White Lining – Monday, 10 August 2020 / Cats Eyes – Monday, 10 August 2020

B4521 County Boundary to A466, Broad OakNew dates

[Between Junction of A466 (as marked) and County Boundary to Wales]

Surface Dressing – Monday, 3 August 2020

White Lining – Monday, 10 August 2020

A466 – B4521 to 40 mph, St Weonards (2 sites) – New dates

[Between junction at B4521 and HRA joint in Village]

Surface Dressing – Monday, 3 August 2020

White Lining – Monday, 10 August 2020 / Cats Eyes – Monday, 10 August 2020

B4348 HardwickeNew dates

[Between junction at B4352 and joint at Farm entrance]

Surface Dressing – Tuesday, 4 August 2020

White Lining – Tuesday, 11 August 2020 and Wednesday, 12 August 2020

C1226 Haywood Lane, Hereford (2 Sites) – New dates

[Extent of works TBC]

Surface Dressing – Tuesday, 4 August 2020

White Lining – Tuesday, 11 August 2020

C1263 – A49T to 30mph, Kings Thorn (2 Sites) – New dates

[Between A49 junction at joint to bus stop in Village]

Surface Dressing – Tuesday, 4 August 2020

White Lining – Tuesday, 11 August 2020

A4110 Abbey Court Farm towards C1107, WigmoreNew dates

[Between Court Farm and Wigmore Village]

Surface Dressing – Wednesday, 5 August 2020

White Lining – Tuesday, 11 August 2020 / Cats Eyes – Tuesday, 11 August 2020

A456 Easton Lodge to County Boundary, Little HerefordNew dates

[Between Eaton Lodge and County Boundary to Wales]

Surface Dressing – Wednesday, 5 August 2020

White Lining – Tuesday, 11 August 2020 / Cats Eyes – Tuesday, 11 August 2020

B4355 – Lower Flintsham to The Stagg, TitleyNew dates

[Between Lower Flintsham and The Stagg PH]

Surface Dressing – Wednesday, 5 August 2020

White Lining – Tuesday, 11 August 2020 and Wednesday, 12 August 2020

C1061 Thornbury – New dates

[Between Junction of B4214 at joint to outside Thornbury Farm entrance]

Surface Dressing – Wednesday, 5 August 2020

White Lining – Wednesday, 12 August 2020

Highway Works – Surface Dressing – Combi WorksRevised Dates

U75238 Watery Lane, Near Hay on Wye – New dates

[Between Crossroads opposite Bell View and junction at Frog Lane]

Surface Dressing – Tuesday, 18 August 2020

White Lining – Tuesday, 25 August 2020

U74200 Upper Maes Coed, St Margarets – New date

[Between Cadifor Farm and Iron Pear Tree]

Surface Dressing – Tuesday, 18 August 2020

C1114 Park House to C1115, Near Pencombe – New date

[Between Marsh Court joint and Park House, as marked]

Surface Dressing – Wednesday, 19 August 2020 (No road markings)

U74209 Tremorithic Road, Bacton (Sites 1 and 2) – New date

[Between Hilling Grange Farm at joint and Fair Oak Farm at joint]

Surface Dressing – Wednesday, 19 August 2020 (No road markings)

U73411 Pinnocks Place, Allensmore (Sites 1 and 2) – New dates

[Between Crossroads opposite Bell View and Crossroads]

Surface Dressing – Wednesday, 19 August 2020

White Lining – Tuesday, 25 August 2020

C1174 C1175 to C1165, CoddingtonNew dates

[Between junction at Broad Oak Farm and junction, as marked]

Surface Dressing – Thursday, 20 August 2020

White Lining – Wednesday, 26 August 2020

C1064 B4214 to U65018, Collington – New dates

[Between Field Farm House at joint to junction at point]

Surface Dressing – Thursday, 20 August 2020

White Lining – Wednesday, 26 August 2020

U65022 The Gains Road, Linley Green – New date

[Between Stone House at junction and Farm, top of hill]

Surface Dressing – Friday, 21 August 2020

New Roundabout Construction

A4110/B4529 Lawtons Cross, Mortimer

Roads closed from Monday, 24 August 2020 to (and including) Friday, 30 October 2020

A combination of full road closures 24/7 and traffic signals in operation – further details to follow soon

Bridge Works

U75232 – Pont-y-Weston Bridge, Dorstone

Tuesday, 18 August 2020 to (and including) Tuesday, 25 August 2020

Road closed between 08.00 hours and 16.00 hours daily

Building sandbag walls either side of water course to isolate.  Removing excess silt build up.  Building new concrete invert and repairing scour under abutment.

Other Road Closures

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until further notice

U71411 – Garway Court Lane – Revised end date

Carriageway deterioration

Full road closure in place until Wednesday, 14 August 2020

ROAD CLOSURES – June – August 2020

Highway Works – Resurfacing Works

A456 Easton Lodge to Village Hall, Little Hereford

Monday, 8 June 2020 and Tuesday, 9 June 2020

Road closed 09.00 hours to 17.00 hours daily

[White lining scheduled for 11 June 2020 under mobile works]

A44 Flaggoners Green, Bromyard

Monday, 22 June 2020

Road closed 09.00 hours to 17.00 hours

[White lining scheduled for 26 June 2020 under mobile works]

A449 Ledbury Rugby Club to Hill House, Ledbury

Wednesday, 24 June 2020 to (and including) Friday, 26 June 2020

Road closed 09.00 hours to 17.00 hours daily

A480 Yazor Church Junction to Mansel LacyNew dates

Wednesday, 15 July 2020 to (and including) Friday, 17 July 2020

Road closed 09.00 hours to 17.00 hours daily

[White lining scheduled for Friday, 24 July 2020 under road closure]

A438 Junction with C1151 to Ashperton, Nr Durlow Common

Friday, 17 July 2020 to (and including) Tuesday, 21 July 2020

Road closed 09.00 hours to 17.00 hours daily.  No weekend working

[White lining scheduled for Friday, 24 July 2020 under road closure]

A44 Between Headbrook and Hattons Garden Roundabout, Kington – NIGHT WORKS

Wednesday, 22 July 2020 to (and including) Friday, 24 July 2020

Road closed 20.00 hours to 06.00 hours each night

[White lining scheduled for Saturday, 25 July 2020 before 06.00 hours]

A44 Junction with C1110 to Stoke Prior

Monday, 20 July 2020 to (and including) Wednesday, 22 July 2020

Road closed 09.00 hours to 17.00 hours daily

[White lining scheduled for Friday, 24 July 2020 under road closure]

A4103 Roman Road, Hereford

Thursday, 23 July 2020 to (and including) Friday, 31 July 2020

Road closed 09.00 hours to 17.00 hours daily.  No weekend working

A417 Bend near Entrance to Whitwick Manor

Thursday, 30 July 2020 to (and including) Tuesday, 4 August 2020

Road closed 09.00 hours to 17.00 hours daily

Highway Works – Surface Dressing Preparatory Works

All works will take place between 08.00 hours and 18.00 hours each day.

A466 – B4521 to 40mph, St Weonards (2 sites)

[Between junction at B4521 and HRA joint in Village]

Thursday, 4 June 2020 and Friday, 5 June 2020

A456 Easton Lodge to County Boundary, Little Hereford

[Between Easton Lodge and County Boundary to Wales]

Monday, 8 June 2020

[White lining scheduled for 11 June 2020 under mobile works]

A4110 Abbey Court Farm towards C1007, Wigmore

[Between Court Farm and Wigmore]

Wednesday, 10 June 2020

C1226 Haywood Lane, Callow

[Extent of works TBC]

Wednesday, 10 June 2020 and Thursday, 11 June 2020

C1263 – A49 to 30 mph Kings Thorne

[Between A49 junction at joint to bus stop in Village]

Friday, 12 June 2020

B4355 Lower Flintsham, Titley

[Between Lower Flintsham and The Stagg PH]

Friday, 12 June 2020 to (and including) Tuesday, 16 June 2020

C1114 Marsh Court Farm to A417

[Between Marsh Court at joint to near Park House as marked]

Tuesday, 23 June 2020

U75238 Watery Lane, Nr Hay on Wye

[Between crossroads opposite Bell View and junction at Frog Lane]

Wednesday, 24 June 2020

C1061 ThornburyNew date

[Between Junction of B4214 at joint to outside Thornbury Farm entrance]

Monday, 13 July 2020

C1174 – C1175 to C1165, Coddington

[Between junction at Broad Oak Farm and junction, as marked]

Tuesday, 14 July 2020

C1064 – B4214 Junction to U65018 Edwin Loach Junction, CollingtonNew dates

[Between Field Farm House at joint to junction at joint]

Tuesday, 14 July 2020 to (and including) Thursday, 16 July 2020

Highway Works – Surface Dressing Works (including white lining and cats eyes, if appropriate) – New dates

All works will take place between 08.00 hours and 18.00 hours each day.  The surface dressing works are scheduled to take one day to complete under a road closure with subsequent days scheduled for the white lining and cat eyes’ installation (where applicable), also planned under daily road closures.

A4110 Abbey Court Farm towards C1107, Wigmore

[Between Court Farm and Wigmore Village]

Surface Dressing – Thursday, 30 July 2020

White Lining – Wednesday, 5 August 2020 / Cats Eyes – Thursday, 6 August 2020

A456 Easton Lodge to County Boundary, Little Hereford

[Between Eaton Lodge and County Boundary to Wales]

Surface Dressing – Thursday, 30 July 2020

Kielylock (Additional sealant to minimise chip loss) – Monday, 3 August 2020 / White Lining – Wednesday, 5 August 2020 / Cats Eyes – Thursday, 6 August 2020

A466 Derestriction – C1234 Crossroads, St Weonards

[Between Village sign and Reduce Speed sign]

Surface Dressing – Monday, 27 July 2020

White Lining – Tuesday, 4 August 2020 / Cats Eyes – Wednesday, 5 August 2020

A466 – B4521 to 40 mph, St Weonards (2 sites)

[Between junction at B4521 and HRA joint in Village]

Surface Dressing – Monday, 27 July 2020

Kielylock – Monday, 3 August 2020 / White Lining – Tuesday, 4 August 2020 / Cats Eyes – Wednesday, 5 August 2020

B4355 – Lower Flintsham to The Stagg, Titley

[Between Lower Flintsham and The Stagg PH]

Surface Dressing – Thursday, 30 July 2020

White Lining – Wednesday, 5 August 2020 and Thursday, 6 August 2020

B4521 County Boundary to A466, Broad Oak

[Between Junction of A466 (as marked) and County Boundary to Wales]

Surface Dressing – Monday, 27 July 2020

Kielylock – Monday, 3 August 2020 / White Lining – Tuesday, 4 August 2020

B4348 Hardwicke

[Between junction at B4352 and joint at Farm entrance]

Surface Dressing – Tuesday, 28 July 2020

White Lining – Tuesday, 4 August 2020

C1226 Haywood Lane, Hereford (2 Sites)

[Extent of works TBC]

Surface Dressing – Tuesday, 28 July 2020

White Lining – Tuesday, 4 August 2020

C1263 – A49T to 30mph, Kings Thorn (2 Sites)

[Between A49 junction at joint to bus stop in Village]

Surface Dressing – Tuesday, 28 July 2020

White Lining – Monday, 3 August 2020

C1061 Thornbury

[Between Junction of B4214 at joint to outside Thornbury Farm entrance]

Surface Dressing – Thursday, 30 July 2020

White Lining – Wednesday, 5 August 2020

Highway Works – Surface Dressing – Combi Works

C1174 C1175 to C1165, Coddington

[Between junction at Broad Oak Farm and junction, as marked]

Surface Dressing – Tuesday, 11 August 2020

White Lining – Wednesday, 19 August 2020

C1114 Park House to C1115, Near Pencombe

[Between Marsh Court joint and Park House, as marked]

Surface Dressing – Tuesday, 11 August 2020 (No road markings)

C1064 B4214 to U65018, Collington

[Between Field Farm House at joint to junction at point]

Surface Dressing – Tuesday, 11 August 2020

White Lining – Tuesday, 18 August 2020

U73411 Pinnocks Place, Allensmore (Sites 1 and 2)

[Between Crossroads opposite Bell View and Crossroads]

Surface Dressing – Monday, 10 August 2020

White Lining – Tuesday, 18 August 2020

U75238 Watery Lane, Near Hay on Wye

[Between Crossroads opposite Bell View and junction at Frog Lane]

Surface Dressing – Monday, 10 August 2020

White Lining – Monday, 17 August 2020

U74200 Upper Maes Coed, St Margarets

[Between Cadifor Farm and Iron Pear Tree]

Surface Dressing – Monday, 10 August 2020

White Lining – Monday, 17 August 2020

U65022 The Gains Road, Linley Green

[Between Stone House at junction and Farm, top of hill]

Surface Dressing – Wednesday, 12 August 2020

White Lining – Wednesday, 19 August 2020

U74209 Tremorithic Road, Bacton (Sites 1 and 2)

[Between Hilling Grange Farm at joint and Fair Oak Farm at joint]

Surface Dressing – Monday, 10 August 2020 (No road markings)

Please find attached a leaflet provided by our sub-contractors, Kielys, who will be undertaking the surface dressing works, which provides the process for used for surface dressing works.  Combi works is simply the same process but using a smaller machine for U and secondary C class roads.

Drainage Improvement Works

C1110 Pencombe to Risbury Road, Pencombe

Monday, 22 June 2020 to (and including) Friday, 26 June 2020

Full road closure

Upgrade to existing surface water drainage system

Bridge Works

C1122 – Laystone Bridge, Marden  (C1122 from C1120 to Wellington Crossing, Marden)

Monday, 22 June 2020 to (and including) Friday, 17 July 2020

Full road closure

Installation of scaffolding and bridge parapet wall repair

Other Road Closures

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until further notice

U71411 – Garway Court Lane

Carriageway deterioration

Full road closure in place until Wednesday, 17 June 2020

Major Utility Works April 2020

Major utility works being undertaken during April 2020

Appreciating that the highways are quieter at present, some of our Utility colleagues are utilising road space so to make the most of the current low levels of traffic on key routes in the city.  Please note that these dates are subject to the lockdown continuing for a period of time but should it be lifted, then these dates will be reviewed to determine the potential impact on the network.   Such works include the following:-

Hinton Road, Hereford

Start: Tuesday, 14 April 2020 for 2 weeks

3-way traffic signals – works at the Hinton Crescent End.  Note: not in the area recently resurfaced.

Utility Company: Cadent

Grandstand Road, Hereford

Start: Tuesday, 21 April 2020 to (and including) Friday, 24 April 2020

2-way traffic signals – Remedial works Faraday Road down to Armadale Close

Utility Company: Welsh Water

A438 Lugg Flats

Start: 21 April 2020 for 2 weeks

2-way traffic signals – Remedial works following relaying of 66kv cables in 2017

Utility Company: WPD

Whitecross Road, Hereford

Start: Friday, 24 April 2020 for 7/8 days

2-way traffic signals – Approx 70 mtr from the Monument roundabout; also working on the roundabout with inside lane closure

Utility Company: Cadent

Barton Road, Hereford

Start: Tuesday, 28 April 2020 for 2 weeks

2-way traffic signals – Near Station Road end of Barton Road

Utility Company – Cadent

ROAD CLOSURES – MARCH/APRIL 2020

Station Road, Bromyard – Works stopped due to Covid-19/lack of resources

Upgrading the road for increased HGV use due to making this road part of the approved HGV route

Tuesday, 21 January 2020 to Friday, 8 May 2020

Lay-by Works – Full Road Closure from 08.00 hours on Tuesday, 21 January 2020 until 17.00 hours on Wednesday, 19 March 2020.

Between Church Lane junction to the Bridge and the B4303 junction to the Bridge

Resurfacing Works / Convoy (2 days) – From 09.00 hours until 17.00 hours each day on:-

Thursday, 16 April 2020 at Tenby Road T-Junction

Wednesday, 6 May 2020 on Lay-by works 

Tenbury Road junction with Station Road

Multiway traffic lights in operation from Monday, 30March 2020 to Friday, 8 May 2020, including weekends

This relates to work taking place at the Tenbury Road junction with Station Road

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until further notice

Please note that there is no access whatsoever for any vehicles to pass through this closure, including emergency vehicles

The C1292 Dormington to Mordiford road is open allowing access to Mordiford School/Village and Fownhope via Woolhope (C1297/C1295) coming from the A438 direction.

Resurfacing Works

B4203 – High View Property access to County Boundary, Upper Sapey [South of High House Crossroads] – Date change

Tuesday, 31 March 2020 and Wednesday, 1 April 2020

Road closed 09.00 hours to 17.00 hours daily

A44 from C1085 via Monkland to Moor Brook, Golden Cross, Monkland

Thursday, 2 April 2020 and Friday, 3 April 2020

Road closed 09.00 hours to 17.00 hours daily

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

Emergency Highway Repairs – Road Closures

B4347 – Kentchurch (Between Pontrilas and Kentchurch) – Cancelled

Monday, 30 March 2020 and Tuesday, 31 March 2020

Road closed 09.00 hours to 17.00 hours each day

No weekend working

Advance Notice – Bridge Works

C1122 – Laystone Bridge, Marden – Postponed until further notice, contractors cannot adhere to 2m rule when erecting scaffold

Monday, 6 April 2020 to (and including) Friday, 1 May 2020

Traffic lights in operation

Bridge parapet wall repair

ROAD CLOSURES – MARCH 2020 – 20.03.2020

Please keep an eye on Twitter@HfdsStreets for all latest updates, in particular relating to the emergency road closures and other highway repair works as a result of Storm Dennis.  Alternatively, please visit www.roadworks.org as this shows all road works currently in place on the network, whether this be traffic lights or road closures.

Apart from the weather continuing to play an active role in our programme,  the pandemic is also having an effect on the workforce and supply chain so the programme can change at any time and sometimes, unfortunately, with little notice. 

Highway Works

Station Road, Bromyard

Upgrading the road for increased HGV use due to making this road part of the approved HGV route

Tuesday, 21 January 2020 to Friday, 6 May 2020

Lay-by Works – Full Road Closure from 08.00 hours on Tuesday, 21 January 2020 until 17.00 hours on Wednesday, 19 March 2020.

Between Church Lane junction to the Bridge and the B4303 junction to the Bridge

Resurfacing Works / Convoy (2 days) – From 09.00 hours until 17.00 hours each day on Thursday, 16 April 2020 at Tenby Road

T-Junction and Wednesday, 6 May 2020 on Lay-by works 

Tenbury Road junction with Station Road

Multiway traffic lights in operation from Monday, 23 March 2020 to Friday, 1 May 2020, including weekends

This relates to work taking place at the Tenbury Road junction with Station Road

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until further notice

Resurfacing Works

B4203 – High View Property access to County Boundary, Upper Sapey [South of High House Crossroads]

Wednesday, 25 March 2020 to (and including) Friday, 27 March 2020

Road closed 09.00 hours to 17.00 hours daily

(Please also note that preparatory works will be taking place on Monday, 23 March and Tuesday, 24 March under traffic lights)       

B4348 – B4348 from Poston Mill Park to Stone Street, Vowchurch

B4347 – B4347 from B4348 to Morehampton Park Farm, Vowchurch [Junction]

Monday, 23 March 2020 and Tuesday, 24 March 2020

Road closed 09.00 hours to 17.00 hours daily

(Please also note that preparatory works will be taking place in the week commencing Monday, 16 March under traffic lights)       

A44 – A44 from C1085 via Monkland to Moor Brook, Monkland [Burton Cross to Golden Cross]

U93000 – Sytches Lane to A44 [Junction]

Wednesday, 25 March 2020 to (and including) Friday, 27 March 2020

Road closed 09.00 hours to 17.00 hours daily

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

The C1292 Dormington to Mordiford road is open allowing access to Mordiford School/Village and Fownhope via Woolhope (C1297/C1295) coming from the A438 direction.

Emergency Highway Repairs – Road Closures

C1031 – Rhyse Lane, Nr Lowe Farm, Staunton on Arrow

Monday, 16 March 2020 to (and including) Friday, 20 March 2020

Road closed 09.00 hours to 17.00 hours daily

A4110/A4113 Leintwardine

Monday, 16 March 2020 to (and including) Friday, 20 March 2020

Road closed 09.00 hours to 17.00 hours daily

Paytoe Lane, Leintwardine – Works extended

Wednesday, 18 March 2020 to Friday, 20 March 2020

Road closed 09.00 hours to 17.00 hours

U92400 – The Wylde, Leinthall Earls

Monday, 23 March 2020 and Tuesday, 24 March 2020

Road closed 09.00 hours to 17.00 hours each day

A4110 – Knapton to Stretford Bridge – NIGHT WORKS 

Monday, 23 March 2020 to (and including) Friday, 27 March 2020

Road closed 19.00 hours to 06.00 hours each night

C1125 – Towards Sutton St Nicholas

Monday, 23 March 2020 and Tuesday, 24 March 2020

Road closed 09.00 hours to 17.00 hours each day

U92622 – The Goggin Road, Richards Castle

Tuesday, 24 March 2020 and Wednesday, 25 March 2020

Road closed 09.00 hours to 17.00 hours each day

B4355 – Rodd (Titley to Presteign Road), Nr Nash/Knill Junction

Wednesday, 25 March 2020 and Thursday, 26 March 2020

Road closed 09.00 hours to 17.00 hours each day

U91601 School Lane/U91600 Green Lane, Titley

Wednesday, 25 March 2020 and Thursday, 26 March 2020

Road closed 09.00 hours to 17.00 hours each day

A480 – Fishpools, Lyonshall

Thursday, 26 March 2020 and Friday, 27 March 2020

Road closed 09.00 hours to 17.00 hours each day

B4347 – Kentchurch (Between Pontrilas and Kentchurch)

Friday, 27 March 2020 and Monday, 30 March 2020

Road closed 09.00 hours to 17.00 hours each day

No weekend working

B4349 – Bowling Green Farm, Clehonger

Saturday, 28 March 2020

Road closed 09.00 hours to 17.00 hours

U70016 – Fawley Chapel, Fawley

Friday, 27 March 2020 to (and including) Tuesday, 31 March 2020

Road closed 09.00 hours to 17.00 hours each day

No weekend working

B4530 – Walford, Leintwardine

Friday, 27 March 2020

Road closed 09.00 hours to 17.00 hours

Footpath Works

U82225 – Green Croft, Hereford

Monday, 23 March 2020 to (and including) Thursday, 9 April 2020

No weekend work

Repair to damaged footpath and road patching works – Give and Take Traffic Management, i.e. the road will not be closed

Advance Notice – Bridge Works

C1122 – Laystone Bridge, Marden

Monday, 6 April 2020 to (and including) Friday, 1 May 2020

Bridge closed from 09.00 hours on Monday, 6 April and will not re-open until 17.00 hours on Friday, 1 May 2020

Bridge parapet wall repair

Highway Works – March/April 2020

Station Road, Bromyard

Upgrading the road for increased HGV use due to making this road part of the approved HGV route

Tuesday, 21 January 2020 to Friday, 24 April 2020

Full Road Closure from 08.00 hours on Tuesday, 21 January 2020 until 17.00 hours on Wednesday, 25 March 2020

Between Church Lane junction to the Bridge and the B4303 junction to the Bridge

Full Road Closure – from 08.00 hours on Thursday, 23 April 2020 until 17.00 hours on Friday, 24 April 2020 

Tenbury Road junction with Station Road

Multiway traffic lights in operation from Thursday, 26 March 2020 to Wednesday, 22 April 2020, including weekends

This relates to work taking place at the Tenbury Road junction with Station Road

B4399 – Holme Lacy Causeway and Holme Lacy Bridge , Holme Lacy

Full road closure currently in place but it is anticipated that both will be re-opened later today (Friday, 6 March)

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until further notice

Resurfacing Works

B4203 – High View Property access to County Boundary, Upper Sapey [South of High House Crossroads]

Monday, 16 March 2020 to (and including) Wednesday, 18 March 2020

Road closed 09.00 hours to 17.00 hours daily

(Please also note that preparatory works will be taking place on Thursday, 12 March and Friday, 13 March under traffic lights)       

B4348 – B4348 from Poston Mill Park to Stone Street, Vowchurch

B4347 – B4347 from B4348 to Morehampton Park Farm, Vowchurch [Junction]

Monday, 23 March 2020 and Tuesday, 24 March 2020

Road closed 09.00 hours to 17.00 hours daily

(Please also note that preparatory works will be taking place in the week commencing Monday, 16 March under traffic lights)       

A44 – A44 from C1085 via Monkland to Moor Brook, Monkland [Burton Cross to Golden Cross]

U93000 – Sytches Lane to A44 [Junction]

Wednesday, 25 March 2020 to (and including) Friday, 27 March 2020

Road closed 09.00 hours to 17.00 hours daily

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

The C1292 Dormington to Mordiford road is open allowing access to Mordiford School/Village and Fownhope via Woolhope (C1297/C1295) coming from the A438 direction.

Emergency Highway Repairs – Road Closures

Please keep an eye on Twitter@HfdsStreets for all latest updates, in particular relating to the emergency road closures and other highway repair works as a result of Storm Dennis.  Alternatively, please visit www.roadworks.org as this shows all road works currently in place on the network, whether this be traffic lights or road closures.

Please also note that the weather continues to play an active role in our programme so this is subject to change at short notice.

B4349 – Clehonger to Kingstone – NIGHT WORKS

Friday, 28 February 2020 to (and including) Sunday, 8 March 2020

Road closed each night 19.00 hours to 06.00 hours (No working on Saturday night)

White lining will be done on Monday, 9 March 2020 under traffic lights

B4348 – Culvert Cross West of Kingstone (close to The Bullring Inn going towards Hanley Court)

Sunday, 8 March 2020

Road closed 09.00 hours to 17.00 hours

White lining will be done on Monday, 9 March 2020 under traffic lights

U75219 – Scar Lane, Hereford

Road closed until further notice

B4214 – Rock Farm, Bromyard – Date changes

Monday, 9 March 2020 and Tuesday, 10 March 2020

Road closed 09.00 hours to 17.00 hours daily

C1031 – Rhyse Lane – NIGHT WORKS

Monday, 9 March 2020 to (and including) Monday, 16 March 2020

Road closed 19.00 hours to 06.00 hours each night (No weekend working)

B4355 – Rodd (Titley to Presteign Road) Nr Nash/Knill Junction

Monday, 9 March 2020 and Tuesday, 10 March 2020

Road closed 09.00 hours to 17.00 hours daily

A480 – Fishpools, Lyonshall

Tuesday, 10 March 2020 and Wednesday, 11 March 2020

Road closed 09.00 hours to 17.00 hours daily

B4399 – Nr Dinedor Mill Culvert Bridge

Tuesday, 10 March 2020 to (and including) Friday, 13 March 2020

Road closed 09.30 hours to 15.30 hours daily

A4113 – Leintwardine

Tuesday, 10 March 2020 to (and including) Friday, 13 March 2020

Road closed 09.00 hours to 17.00 hours daily

B4530 Walford (North), Leintwardine

Wednesday, 11 March 2020 and Thursday, 12 March 2020

Road closed 09.00 hours to 17.00 hours daily

U91607 – Stockley Cross towards U91606 Junction

Wednesday, 11 March 2020

Road closed 09.00 hours to 17.00 hours

C1007 – Kinsham

Thursday, 12 March 2020 and Friday, 13 March 2020

Road closed 09.00 hours to 17.00 hours

B4352 – Junction with Pentre Lane, Bredwardine

Thursday, 12 March 2020 and Friday, 13 March 2020

Road closed 09.00 hours to 17.00 hours daily

Holme Lacy Road, Hereford (Between Putson Avenue and Winston Avenue)

Saturday, 14 March 2020 and Sunday, 15 March 2020

Road closed 09.00 hours to 17.00 hours daily

A4110/A4113 Leintwardine

Monday, 16 March 2020 and Tuesday, 17 March 2020

Road closed 09.00 hours to 17.00 hours daily

C1208 – Dorstone, just above Nanty Bar

Monday, 16 March 2020

Road closed 09.00 hours to 17.00 hours

A4110 – Knapton to Stretford Bridge – Change in dates and times

Monday, 16 March 2020 to (and including) Friday, 20 March 2020

Road closed 19.00 hours to 06.00 hours each night

A4113 – Leintwardine

Wednesday, 18 March 2020 to (and including) Friday, 20 March 2020

Road closed 09.00 hours to 17.00 hours daily

C1195 – Stockley Hill, Nr Peterchurch

Wednesday, 18 March 2020 and Thursday, 19 March 2020

Road closed 09.00 hours to 17.00 hours daily

U71000 – Tresick Mill Road, Nr Brookside Cottages, Hoarwithy

Monday, 23 March 2020 and Tuesday, 24 March 2020

Road closed 09.00 hours to 17.00 hours daily

A4113 from A4110 to Manor Farm, Leintwardine

Monday, 23 March 2020 and Tuesday, 24 March 2020

Road closed 09.00 hours to 17.00 hours daily

U72007 – Church Road, Holme Lacy

Tuesday, 24 March 2020 and Wednesday, 25 March 2020

Road closed 09.00 hours to 17.00 hours daily

U92211 – Old Shop Lane, Leintwardine

Wednesday, 25 March 2020 and Thursday, 26 March 2020

Road closed 09.00 hours to 17.00 hours daily

U93405 – Kings Pyon

Thursday, 26 March 2020 and Friday, 27 March 2020

Road closed 09.00 hours to 17.00 hours daily

U94216 – Cogwell Brook Lane, Kimbolton

Friday, 27 March 2020 and Saturday, 28 March 2020

Road closed 09.00 hours to 17.00 hours daily

Bridge Safety Inspections

A series of bridge safety inspections will take place at the following locations, under a daily road closure between 09.00 hours and 16.30 hours.  If the surveys can be concluded sooner, then the road closure will be taken off earlier than scheduled.

Holme Lacy Bridge                        Friday, 6 March 2020

Kerne Bridge                                  Saturday, 7 March 2020

Wilton Bridge                                 Sunday, 8 March 2020

Eaton Bridge (A44 Leominster)   Monday, 9 March 2020

Old Wye Bridge, Hereford           Tuesday, 10 March 2020

Bredwardine Bridge                      Wednesday, 11 March 2020

Kinsham Bridge                              Thursday, 12 March 2020

Highway Works – February/March 2020

Station Road, Bromyard

Upgrading the road for increased HGV use due to making this road part of the approved HGV route

Tuesday, 21 January 2020 to Friday, 24 April 2020 – extended.

Full Road Closure from 08.00 hours on Tuesday, 21 January 2020 until 17.00 hours on Wednesday, 25 March 2020 – Works extended

Between Church Lane junction to the Bridge and the B4303 junction to the Bridge

Full Road Closure – from 08.00 hours on Thursday, 23 April 2020 until 17.00 hours on Friday, 24 April 2020  – Revised dates

Lay-by by Church Lane

Multiway traffic lights in operation from Thursday, 26 March 2020 to Wednesday, 22 April 2020, including weekends – Revised dates

This relates to work taking place at the Tenbury Road junction with Station Road

B4399 – Holme Lacy Causeway and Holme Lacy Bridge , Holme Lacy

Full road closure in place with immediate effect until further notice

B4224 – Fiddlers Green, Fownhope

Structural wall failure and landslip

Full road closure in place until further notice

Resurfacing Works

B4203 – High View Property access to County Boundary, Upper Sapey [South of High House Crossroads]

Monday, 16 March 2020 to (and including) Wednesday, 18 March 2020

Road closed 09.00 hours to 17.00 hours daily

B4214 – Bromyard Rugby Club, Bromyard – Change in dates

Wednesday, 18 March 2020 to (and including) Friday, 20 March 2020 

Road closed 09.00 hours to 17.00 hours daily

A4110 – Knapton to Stretford Bridge

Monday, 23 March 2020 to (and including) Friday, 27 March 2020

Road closed 09.00 hours to 17.00 hours daily

B4348 – B4348 from Poston Mill Park to Stone Street, Vowchurch

B4347 – B4347 from B4348 to Morehampton Park Farm, Vowchurch [Junction]

Monday, 23 March 2020 and Tuesday, 24 March 2020

Road closed 09.00 hours to 17.00 hours daily

A44 – A44 from C1085 via Monkland to Moor Brook, Monkland [Burton Cross to Golden Cross]

U93000 – Sytches Lane to A44 [Junction]

Wednesday, 25 March 2020 to (and including) Friday, 27 March 2020

Road closed 09.00 hours to 17.00 hours daily

C1257 – Symonds Yat West Road (Ferrie Lane)

Road closed until further notice

Mordiford Bridge

Mordiford Bridge remains close.  The Environment Agency’s pumps are still in position on the bridge in an attempt to alleviate pressure from the River Lugg. 

The C1292 Dormington to Mordiford road is open allowing access to Mordiford School/Village and Fownhope via Woolhope (C1297/C1295) coming from the A438 direction.

Emergency Works – Road Closures

Please keep an eye on Twitter@HfdsStreets for all latest updates, in particular relating to the emergency road closures and other repair works as a result of Storm Dennis.  Alternatively, please visit www.roadworks.org as this shows all road works currently in place on the network, whether this be traffic lights or road closures.

Hinton Road, Hereford

Wednesday, 26 February 2020 to (and including) Saturday, 29 February 2020

Road closed 09.00 hours to 17.00 hours daily

Flood recovery works including resurfacing and installing speed cushions (Saturday) [From entrance to King George’s Playing Field to mini roundabout, going towards Rotherwas direction]

B4349 – Clehonger to Kingstone

Friday, 28 February 2020 to Saturday, 29 February 2020 – NIGHT WORKS

Road closed 19.00 hours (Friday) to 06.00 hours (Saturday)

Note: There are 4 separate sections of road being repaired:

  • 30mph sign towards Clehonger Village
  • East of U73228 to U73413 Brook View
  • Arkstone Court Lane to 40mph sign
  • West approach to bend at Cage Brook (Kingstone)

Flood recovery works

Holme Lacy Road, Hereford (Between Putson Avenue and Winston Avenue)

Saturday, 7 March 2020 and Sunday, 8 March 2020

Road closed 09.00 hours to 17.00 hours daily

Flood recovery works

Skip to content